The Amazing Northampton Run half marathon returns on Sunday 12 September 2027. Every road it closed in 2026, with closing and reopening times.
This event has taken place. The Amazing Northampton Run was held on Sunday 13 September 2026. The closure plan below is kept as the record of which roads shut and when they reopened, and as a guide to what to expect when the run returns. The event is normally held on the second Sunday in September.
The next run is on Sunday 12 September 2027, from Market Square, according to the organiser’s event page. The 2027 closure plan has not been published yet. The 2026 roads and times are below.
The half marathon started on Market Square at 9.30am. Closures moved with the runners, beginning before 9.30am at the Sixfields end and finishing at 12.30pm in the town centre. The town centre streets around the Guildhall and Derngate were shut until half past twelve, Abington Street for the whole event, and everything else reopened as the last runner passed.
Last checked 11 October 2026.
When is the next Northampton Run?
Sunday 12 September 2027. The organiser lists it as the next race on its event page, which also carries the results of every run since 2023 and a waiting list. The course has followed the same pattern each year, so expect the same roads to close on the same morning; we will update this page when the 2027 road closure plan is out.
Half marathon, relay or fun run: the closures are the same
There is one set of closures for the whole morning. The race many people search for as the Northampton marathon is this half marathon; the relay runs the same 13.1 miles in three legs, and the fun run stays inside the town centre and University Drive sections, which are already shut.
What is happening
- A 13.1 mile half marathon, starting on Market Square and finishing on Abington Street
- A three-leg relay over the same course
- A three-mile fun run, which uses the town centre and University Drive sections
- The Mayor of Northampton, Cllr Mike Hallam, joins the pre-race warm-up at about 9.15am
The route goes past the Guildhall and 78 Derngate, out to Franklin’s Gardens, and through the Racecourse, Abington Park and Barnes Meadow. Northampton Town Council has funded 12 mobile toilets at the Racecourse, the halfway point. West Northamptonshire Council has paid half the cost of the temporary traffic regulation order that makes the closures legal. (West Northamptonshire Council, 10 September 2026)
Every road closure, in route order
These times come from the organiser’s published route closure plan. The plan is built around a fastest half marathon of 1 hour 12 minutes and a slowest of 3 hours, so the reopening times are the latest expected, not a fixed schedule. Several sections are on rolling release, which means they open as soon as the last runner has passed.
| Road | Closed from | Runners through | Reopens by |
|---|---|---|---|
| Wood Hill | 9.00am | 9.30 to 9.45am | 10.00am |
| Bridge Street | 9.00am | 9.30 to 9.50am | 10.00am |
| London Road, St Leonard's to South Bridge | 9.30am | 9.33 to 9.40am | 9.45am |
| St Leonard's Road | 9.30am | 9.35 to 9.45am | 9.50am |
| Main Road | 9.30am | 9.36 to 9.50am | 9.55am |
| Ringway | 9.30am | 9.38 to 9.55am | 10.00am |
| Walter Tull Way | 9.00am | 9.48 to 10.18am | 10.30am |
| Weedon Road, service road | 9.30am | 9.50 to 10.33am, two passes | 10.30am |
| Ross Road | 9.30am | 9.51 to 10.25am | 10.30am |
| Spencer Bridge Road | 9.30am | 9.55 to 10.42am | 10.50am |
| Grafton Street | 9.30am | 9.58 to 10.46am | 10.50am |
| Barrack Road | 9.30am | 10.00 to 10.48am | 10.50am |
| Kettering Road | 10.00am | 10.08 to 11.07am | 11.10am |
| Abington Avenue | 10.00am | 10.09 to 11.13am | 11.20am |
| Roe Road | 10.00am | 10.11 to 11.15am | 11.20am |
| Adnitt Road | 10.00am | 10.12 to 11.15am | 11.20am |
| Wantage Road | 10.00am | 10.12 to 11.17am | 11.20am |
| Wellingborough Road | 10.00am | 10.13 to 11.19am | 11.20am |
| Park Avenue South | 10.00am | 10.16 to 11.31am | 11.35am |
| Rushmere Road | 10.00am | 10.18 to 11.38am | 11.40am |
| Nunn Mills Road | 9.45am | 10.30 to 11.59am | 12.00pm |
| Cattle Market Road | 9.30am | 10.36am to 12.17pm | 12.30pm |
| Victoria Gardens | 9.30am | 10.37am to 12.19pm | 12.30pm |
| St John's Street | 9.30am | 10.38am to 12.19pm | 12.30pm |
| Guildhall Road | 9.30am | 10.38am to 12.21pm | 12.30pm |
| Derngate | 9.30am | 10.39am to 12.25pm | 12.30pm |
| Spring Gardens | 9.30am | 10.40am to 12.26pm | 12.30pm |
| St Giles Terrace | 9.30am | 10.40am to 12.27pm | 12.30pm |
| Abington Street | Whole event | 10.41am to 12.30pm | After the event |
The streets that stay shut all morning
A block of the town centre is listed as a whole-event closure rather than a rolling one:
- Abington Street
- Derngate
- Spring Gardens
- St Giles Street and St Giles Square by the Guildhall
- Guildhall Road
- The A5123 at the Morrisons car park entrance
Two arrangements sat alongside the closures. Sixfields car park was shut on the Saturday night and opened at 9.30am on the Sunday, and the recycling centre at Sixfields opened late because of the closure at the Walter Tull Way roundabout. (The Amazing Northampton Run, road closures)
Road closures in Northampton today
There are no run closures now; the event is over until September 2027. For roads shut today, roadworks and diversions, see our roadworks and travel page, which is updated from the council’s live register. Event closures coming up this autumn are on our Remembrance Sunday and fireworks pages.
What it means for you
The plan is a sequence of releases, not one long shutdown. That is worth knowing for next year: find your road in the table and work from the reopening time, which is the worst case rather than the expected one.
The route splits the town for most of the morning. The A4500 at Wellingborough Road was due back by 11.20am, Barrack Road by 10.50am and Ringway by 10.00am, so crossing north of the course was the quicker option. For closures happening now, see our roadworks and travel page.
The premium on-street parking zone sits inside the closure. Abington Street, George Row, Mercers Row and St Giles Street are all on it, so those bays are unusable until half twelve on run day. Our parking guide has the multi-storeys and their charges.
If you want to watch, the finish is on Abington Street. The Northampton Town Centre BID has funded the crowd barriers on the finishing straight. In 2026 the organisers asked people living on the route to come out and cheer.
If you want to run in 2027, the organiser’s event page has a waiting list for the next race. Entries for 2026 closed at 8am on Friday 11 September.
Also on The Northampton Wire
- Roadworks and travel in Northampton, updated from the council’s live register
- Parking in Northampton, car parks, charges and the premium zone
- Things to do in Northampton, what is on across the town
- Town centre parking closures, car parks shut or changed
Frequently asked questions
When is the next Northampton Run?
Sunday 12 September 2027, starting from Market Square. That is the date the organiser’s event page gives for the next race. The 2027 road closure plan has not been published yet; the 2026 plan below is the best guide to what will shut.
What time do the Northampton half marathon road closures end?
In 2026 the last roads reopened at 12.30pm. The town centre streets around the Guildhall and Derngate stayed shut until then, Abington Street for the whole event, and the rest reopened as the last runner passed, mostly between 9.45am and 11.40am.
Is there a Northampton marathon?
The road race people search for as the Northampton marathon is The Amazing Northampton Run, which is a half marathon of 13.1 miles with a relay and a three-mile fun run on the same day. Its road closures are the ones listed on this page.
Which roads close for the Northampton fun run?
The three-mile fun run uses the town centre and University Drive sections of the half marathon course, so it sits inside the same closures: Abington Street, Derngate, Guildhall Road, St Giles Square and the streets around them.
Have your say